Metro must be reinstated to Sandyford and go further towards Wicklow

The Irish Times reported that the Metro is to be cancelled to Sandyford. At present the Green Luas line is very overcrowded at rush hour, people can’t get on, and the much higher capacity Metro is needed. The new large town of Cherrywood is being built on the Luas and the very overcrowded M50/N11. In future the Luas is planned to be extended to Bray.  The Metro must be extended to Sandyford, as was planned, and further otherwise the existing Luas will be utterly full.

The Metro should end in a large Park n’ Ride site on the Southside, as is planned for the Northside near Swords, and a route should be reserved for a future extension to Bray.

Comments are closed.

Get Involved And Help The Campaign Contact Me